EXPERIMENTAL TEST FACILITY TO TEST A PROTOTYPE OF THE AIR HEAT EXCHANGER GATE FOR THE ADVANCED BN REACTOR PLANT. DESIGN AND CONSTRUCTION ITEMS

22 Apr 2022, 14:18
12m
Vienna, Austria

Vienna, Austria

ORAL Track 5. Test Facilities and Experiments 5.3 Experimental Programs II

Speaker

Mr Maksim Grushko (JSC “Afrikantov OKBM”)

Description

To enhance safety, an emergency heat removal system (EHRS) is provided as a part of the reactor plant. One of the main elements of this system is an air heat exchanger (AHX), equipped with a device for air flowrate control with passive opening principle, which is a gate.
To ensure operability of this gate, high-temperature experimental test facility was developed and manufactured. This test facility permits to test the gate under operation conditions similar to the standard ones (temperature higher than 500°C).
A gate prototype is installed on a special box (3000 × 3000 mm) located on the site.
For uniform heating of air in the gate box equipped with an electric heating system of 170 kW electric power; and a special slot gap with optimum space provided by a spacing system is made.
To arrange flowrate, cold air supply and hot air discharge, air duct paths with required valves and a blower (fan) were designed. Because of the high temperature, the air circuit was unclosed; air duct outlet with special flare emission beyond the bounds of the building was arranged.
High-temperature thermal insulation is used at the test facility to ensure safe operation.
An information-and-measuring system was designed for on-line reporting on test facility parameters (temperature, pressure, flowrate, etc.).
Considering large overall dimensions and a high-altitude location of the test facility, special process tooling was developed in the course of test facility construction.
A process was developed and process tooling was manufactured to provide the slot gap in the course of manufacture.
A process was developed to simplify thermal insulation installation.
Now, the gate is tested at the made experimental test facility.

Speaker's title Mr
Speaker's email address frolova@okbm.nnov.ru
Country/Int. organization Russian Federation
Affiliation/Organization JSC “Afrikantov OKBM”

Primary author

Mr Maksim Grushko (JSC “Afrikantov OKBM”)

Co-authors

Mr Dmitry Gusev (JSC “Afrikantov OKBM”) Mr Sergey Rukhlin (JSC “Afrikantov OKBM”)