Consorzio RFX
Author in the following contributions
- Status of the ITER Neutral Beam Test Facility and the first beam operations with the full-size prototype ion source
- Completion of assembly and high-voltage insulation test of DC 1 MV power supply system for the ITER neutral beam test facility
- [REGULAR POSTER TWIN] Status of the ITER Neutral Beam Test Facility and the first beam operations with the full-size prototype ion source