Conveners
New Devices & Technology: FIP/3
- Laila El-Guebaly (USA)
Mr
Andreas Dinklage
(Germany)
16/10/2014, 16:40
Oral
The stellarator concept offers a possible alternative to a tokamak Fusion Power Plant (FPP). One of the missions of the EU Roadmap to the realisation of fusion energy is to develop the stellarator line to maturity. World-wide efforts on different stellarator lines cover a substantial range of candidate magnetic configurations; the EU programme focuses on the optimized, helical advanced...
Mr
Englen Azizov
(Russian Federation)
16/10/2014, 17:00
Oral
Status of T-15 upgrade tokamak is presented. T-15 upgrade tokamak has the following parameters: R=1.48 m, a=0.67 m, B=2.0 T, Ipl= 2.0 MA. Poloidal system is capable of realizing the divertor both with single null and double null magnetic configuration and plasma shape with elongation k95 = 1.7-1.9 and triangularity delta 0.3-0.4. Installation will equipped with the auxiliary plasma heating and...
Mr
Richard Kemp
(UK)
16/10/2014, 17:20
Oral
To allow coherent conceptual design activities, and later engineering design activities, for a demonstration fusion power plant (DEMO), a self-consistent design point must first be developed. The DEMO design point is a set of parameters characterising the key features of a DEMO power plant on which evaluation of different systems can be based with confidence that there are no significant...
Mr
Nobuyuki Asakura
(Japan)
16/10/2014, 17:40
Oral
A
Magnetic configurations of advanced divertor, i.e. super-X (SXD) and snowflake, were recently proposed, and the concepts have been demonstrated in experiments. For the application to the Demo reactor, engineering design as well as the plasma performance should be determined. A short super-X divertor (short-SXD) is proposed as a new option for Demo divertor, where field line length from the...
Mr
Kaiming Feng
(China)
16/10/2014, 18:00
Oral
A
China had promised to test its TBM modules during different ITER operation phase and have signed the CN HCCB TBMA with ITER IO recently. Related design and R&D activities for each TBM modules with auxiliary systems and interface with ITER facility were introduced. The preliminary conceptual design of CN HCCB TBM has been completed while the design optimization is in progress. Basic...
Mr
Keeman Kim
(Korea, Republic of)
16/10/2014, 18:20
FIP - Fusion Engineering, Integration and Power Plant Design
Oral
Korean Fusion Energy Development Promotion Law (FEDPL) was enacted in 2007 to promote a long-term cooperative fusion research and development among participating industries, universities and research institutes. As a following step, a conceptual design study for a steady-state Korean fusion demonstration reactor (K-DEMO) has been initiated in 2012. The conceptual design activity will continue...