Since 18 of December 2019 conferences.iaea.org uses Nucleus credentials. Visit our help pages for information on how to Register and Sign-in using Nucleus.

Improvement of Regulatory Framework on Radioactive Waste Management Facilities in Korea

Not scheduled
20m
M-Building (IAEA Headquarters, Vienna)

M-Building

IAEA Headquarters, Vienna

Vienna International Center - Wagramer Str 5 - PO Box 100, 1400 Vienna, Austria
POSTER Track 2 - Managing the interrelationships in policy, strategy, legislation, and regulation

Speaker

Ms EUNJIN SEO

Description

In Korea, as radioactive waste management facilities have gone into full operation, the regulatory body has been revising the Nuclear Safety Act(NSA) to introduce several practices to radioactive waste management facilities including Periodic Safety Review(PSR) to ensure that the safety regulation framework related to assessment and obligation during operation is consistent with international standards. Considering the findings of IAEA IRRS mission and overseas precedents, the NSA is revised to lay a legal basis in 2021 for a PSR to be performed every 10 years by a radioactive waste management facility before the time comes when the first PSR needs to be performed. Major revisions to the NSA include the obligation of the operator to conduct a PSR and submit the results and the authority of the regulatory body to order corrective or supplementary measures when the results of the PSR or follow up actions are not sufficient. Another significant revision to the NSA is to establish a regulatory procedure related to termination of operation (decommissioning of radioactive waste treatment or storage facilities, closure and post-closure institutional control of disposal facilities), with consideration of characteristics of each facility, so as to be prepared for termination of operation of a radioactive waste management facility. The NSA is to be revised in such ways to obtain a regulatory approval for decommissioning of a radioactive waste management facility and to clearly define a procedure and a list of documents to be submitted along with an application for decommissioning approval. Additionally, a closure procedure for a radioactive waste disposal facility, etc. which cover approval for closure, documents to be submitted when an application is filed is to be defined. Through these legislative changes, it is expected that a regulatory framework for all stages of the life-cycle of a radioactive waste management facility will be established.

Key Words: Radioactive Waste Management Facilities, Periodic Safety Review, Decommissioning, Post-closure Institutional Control, Regulatory Framework