Since 18 of December 2019 conferences.iaea.org uses Nucleus credentials. Visit our help pages for information on how to Register and Sign-in using Nucleus.

Preparation for the future spent fuel transportation and disposal at Loviisa NPP

28 Jun 2019, 10:10
20m
Oral Track 3: Transportation in the back-end Session 3.1

Speaker

Dr Jari Tuunanen (Fortum Power and Heat oy)

Description

Spent fuel disposal in Finland is in the phase where Posiva is preparing for construction of the encapsulation plant and spent fuel disposal tunnels, and later submitting the operating license application. As part of the preparations, Posiva is planning the future operating phase of the spent fuel encapsulation and final disposal facility. The original operating plan has been to dispose of fuel from both Olkiluoto and Loviisa NPPs in parallel starting around 2024. Another option is to start disposing fuel from Olkiluto NPP first, and continue with Loviisa NPP fuel later. Whatever production option is selected it requires actions and preparations at Loviisa NPP. This paper presents some of these actions.

Country or International Organization Finland

Primary author

Dr Jari Tuunanen (Fortum Power and Heat oy)

Presentation materials

There are no materials yet.

Peer reviewing

Paper