Mr
Raul Villegas
(Brazilian Nuclear Energy Comission)
26/05/2016, 09:00
Case Studies and Waste Management in Environmental Remediation
Poster
The Unidade de Tratamento de Minérios (UTM, Ore Treatment Facility) was the first uranium ore mining and ore production site to operate in Brazil. Twenty years after ceasing operations, the site is going through an environmental restoration and decommissioning process, which is to be conducted by the operator and regulated by the national nuclear and environmental authorities. The UTM case can...
Mrs
Gema Fleitas
(Center of protection radiationa and hygiene)
26/05/2016, 09:00
Case Studies and Waste Management in Environmental Remediation
Poster
ABSTRACT:
From the need for Cuba to have a facility for long term storage of radioactive waste, the study of the conditions of the existing waste storage for short and medium life was performed. A methodology that included site characterization (including geological, hydrogeological, socio-economics), safety assessment and evaluation of the state of construction of the facility was used...
Dr
- SAÏDOU
(Nuclear Technology Section, Institute of Geological and Mining Research)
26/05/2016, 09:00
Case Studies and Waste Management in Environmental Remediation
Poster
The present paper summarizes the findings of studies carried out in the gold mining, uranium and thorium bearing regions of Cameroon. It also underlines future prospects to strengthen the radiological protection of members of the public exposed to environmental natural radiation in Cameroon. After soil and foodstuff sampling, α- and γ- spectrometry were used to determine activity...
Prof.
Fernando P. Carvalho
(Instituto Superior Técnico/Laboratório de Protecção e Segurança Radiológica,)
26/05/2016, 09:00
Case Studies and Waste Management in Environmental Remediation
Poster
Abstract: The former uranium mine site of Forte Velho, Guarda, was abandoned in the 70s. Although kept under surveillance till present, there has been no action about the cleanup of this site. A radiation risk assessment of Forte Velho site was carried out on 2014 and results are summarized herein. Radiation dose levels and radioactive waste piles recommend clean-up and implementation of...
Mr
Ulf Barnekow
(Wismut GmbH)
26/05/2016, 09:00
Case Studies and Waste Management in Environmental Remediation
Poster
In Eastern Germany uranium mining lasted from 1945 until 1990 leaving enormous environmental impacts. From 1951 to 1990 the former Soviet-German WISMUT company produced a total of about 216,000 t of uranium, mainly in two large mills located near Seelingstädt (Thuringia) and Crossen (Saxony). Nearby the former Seelingstädt mill tailings dams were erected in mined-out open pits for separate...
Mr
ALEXANDRU EREMIA
(National Commission for Nuclear Activities Control (CNCAN)/ROMANIA), Mrs
CORA GOICEA
(NATIONAL COMMISSION FOR NUCLEAR ACTIVITIES CONTROL - CNCAN)
26/05/2016, 09:00
Case Studies and Waste Management in Environmental Remediation
Poster
1. Regulatory Framework:
• Law 111 on the safe deployment of nuclear activities, republished, stating that for the carrying out of a nuclear activity generating or having generated radioactive waste, the authorisation holder shall compulsorily be responsible for the management of radioactive waste generated by his own activity; bear the expenses related to the collection, handling,...
Mr
Azhar AZHAR
(BAPETEN)
26/05/2016, 09:00
Case Studies and Waste Management in Environmental Remediation
Poster
Abstract
Because of economical reason, the operation of Phosphoric Acid Purification Facility-PT Petrokimia Gresik was stopped on 12 August 1989. In June 2000 BAPETEN (Indonesian Nuclear Energy Regulatory Agency) recommended that PT. Petrokimia Gresik apply for decommissioning permit to BAPETEN as soon as possible. BAPETEN had issued the dismantling permit on 2 April 2008. Some...