Description
The purpose of this session is:
• To review progress in decommissioning technologies and cost estimation over the past decade and to identify challenges and needs in the future
• To review current developments, including from damaged facilities, with a view to identify existing gaps in knowledge and needed improvements
Mr
Manuel Manuel Ondaro Pino
(ENRESA)
25/05/2016, 11:30
Technical and Technological Aspects of Implementing Decommissioning Programmes
Oral
In 1964, construction started on the José Cabrera Nuclear Power Plant, located in Almonacid de Zorita, 43 miles east of Madrid, Spain. The José Cabrera Nuclear Power Plant is a single-loop pressurized water reactor with 160 MWe of power installed. The main components, particularly the vessel and vessel internals, were manufactured and supplied by Westinghouse. The plant operated between 1968...